Drilled piers, spread footings, slabs and equipment pads coordinated with the substation construction sequence.

Discuss this scope
Substation Foundations

Capabilities

Scope of work.

Dedicated foundation crews install substation piers, footings, slabs and equipment pads. Anchor bolts, conduit and grounding interfaces are coordinated with the structural and electrical installation sequence. Marine and access resources are available for difficult sites.

  • Drilled piers for steel structures and dead-ends
  • Spread footings and transformer pads with oil containment
  • Control building slabs
  • Anchor bolts set to the steel supplier's templates
  • Conduit stub-ups and grounding tie-ins placed with the concrete
  • Greenfield yards and expansions inside operating stations